Unit 7 Sustainable Tourism London Olympiad

Unit 7 Sustainable Tourism London Olympiad Assignment

introduction:

Permanent tourism is attracting the attention of travel industry and it is getting recognized especially in the case of majority of tourist destinations.
There is more awareness on this issue and there is a desire to recognize the impact of tourism on the environment (Valentine, 2000). The concept of Unit 7 Sustainable Tourism London Olympiad Assignment has also gained popularity in the case of small and emerging destinations as these destinations are also ready to attract environmentally friendly tourists who want to go to a place where the safety of the environment Attempts are being made for. (Strongza, 2007).

Unit 7 Sustainable Tourism London Olympiad Assignment, Sustainable Tourism London Olympiad, Assignment Help UK, Assignment Help, Assignment Help Coventry

Work 2- Analyze the development of tourism at different levels using the London Olympiad
2.1 Analysis of the characteristics of the tourism development plan at different levels for the London Olympiad.

Also read:-Sustainable Tourism Assignment Help

The development of tourism is a very complex process and it is necessary to make it simpler so that the tasks can be transformed into realistic achievements. The site can be started by the board team which oversees the entire development of the project. This team finalizes the Master Plan of the site and if the plan is required to make any changes it can also invite suggestions by people. Number of hotels, visitors who can expect maximum capacity as well as car parking, walkway, as well as other issues such as funding the project, recreational equipment and activities can be offered on the site, backup plans Etc. Everyone was discussed by this team. Later, architects, contractors and local supervisors start working jointly to discuss the site's plan. This is the level where the complex details of the scheme are discussed, such as the necessary investment, the necessary raw materials and the time to start work on the site. After this phase, site engineers and contractors work together jointly so that the plans provided by designers and architects can be executed. In this process of planning, there is a need to consider the maximum possible publicity including the public's minimum response and all the possibilities to adopt the option so that the project can not achieve the desired success.


Also read:-Unit 7 Sustainable Tourism Development

2.2 Evaluate the importance of interactive planning systems and processes in the development of tourism for the London Olympiad
If the tourism development plan is not properly created, it can leave permanent marks on the physical, economic, social and cultural environment of a particular destination. Therefore, if tourism development plans have not been created properly, then local residents can be isolated as a result, and at the same time, how much pressure is there on the infrastructure of the destination. The scale of any inappropriate nature and development can be the result of a lack of national or local planning and regulation or license-fair tourism policies. It is the responsibility of the other stakeholders of the tourism industry as well as the government, that the development of tourism should be long-term prosperity and also to ensure that the quality of future life is not jeopardized due to development.

A very successful way of involving all stakeholders in the development of a project could be by adopting an interactive scheme system. In particular, in the case of a national importance project such as the London Olympiad, it is very important that all stakeholders are involved in this project from the very beginning, so that the project has a resistance and there is an unexpected problem on the way. The project can be removed and it can be completed quickly. And in the case of an interactive planning system, electronic media such as multimedia and e-mail is used as the planning tool, with the help of input of all stakeholders including local people. Also, the government may have information about things that need to be included in the project and if the concerns of local people are heard, which in turn save cost and time, keep them out of the project should go. Similarly, in the case of any major development, decision making process is also very important. Therefore, when all the stakeholders have agreed to the project on the same platform, it is easy to successfully complete the project. Similarly, with the help of an interactive planning system, it is possible for all stakeholders to voice their concerns and raise issues that need to be included in the project at the time of designing the project so that there can be no vendetta in the future. In this case, there is a lot of interaction at the initial level.

WhatsApp: +61-422447123,+44-7551749054,Call Us:+31-625-218-885,+61-451-442-632
https://www.cheapassignmenthelp.co.uk

Comments

Popular posts from this blog

HND Assignment Writing Service from the Best Writers

Unit 3 Employment and Professional Development

Unit 16 Understanding Specific Needs in HSC